A few of MSL Contracts recent projects includes:-

Loxtons Foods - At Loxtons foods an old and worn out food factory had to be refurbished in three weeks. Most of the internal walls were knocked down and rebuilt. MSC were responsible for installing new floor screeds and coving detail. There were prep. areas to be green and cooking areas to be done in red. - Read More >>
Severn Trent Concrete Repairs Severn Trent - Maintenance Contracts Ltd were asked to complete concrete repairs and install a new anti-slip surface to the perimeter on No.3 PST tank. After an initial inspection, work was started to repair the damaged 100 linear metre’s with an epoxy mortar on each of the tanks. - Read More >>
Unilevers Unilever - Maintenance Contracts Ltd were asked to install an anti-slip profile on the movable checker plate dock levellers at Unilevers. The system comprises of primarily vacuum shot blasting the metal to sa 2.5 (an in-house operation). Apply one coat of Grip-Seal High Build Epoxy Resin then broadcast a silicone carbide aggregate to create the anti-slip profile. - Read More >>
Argos Ltd - Maintenance Contracts Ltd were asked to install new de-marcation lines for pedestrian traffic throughout their Heywood distribution centre. Previous contractors had been unable to provide a marking system that was durable enough to withstand the sheer volume of forklift traffic. - Read More >>