Case Study #14

Roe Developments and Kingsfield Electronics Case Study

What they needed

At Kingfield Electronics in Chesterfield they manufacture electronic components. Roe Developments are the main contractor developing the site and MSC were sob-contracted to refurbish the floor. They are expanding into an old industrial warehouse and needed an anti-static floor in the assembly area. The floor area is approximately 3000m2.

before

What we did

Maintenance Supplies Contracts competed for and won the contract to install the system. This consisted of Vacuum shot blasting the whole area and applying a special electrically dissipative primer and installing a copper tape system. On top of this there is a 2-3mm Self Smoothing grey resin trowelled onto the copper tape. This resin contains carbon micro fibre and which transfers any static through the floor to an earth. The job was completed in time and within budget.

after

Client Feedback

The job was completed in time and within budget to a satisfactory standard.

after