Case Study #2

Water World Case Study

What they needed

The tiled floor surrounding the pool at Waterworld was becoming very dated. As part of the refurbishment project the owner, Secret Millionaire Mo Chaudry wanted a surface that resembled a beach. After producing various samples the system was created.

What we did

Owing to the tight schedule we vacuum shot blasted the surface on Sunday night and applied the DPM Epoxy Resin, The anti slip screed was installed on Monday morning. And sealed on Monday evening. The resin beach was allowed to cure all day Tuesday and was back in action on Wednesday lunchtime.

I think the pictures speak for themselves.

Client Feedback

‘MSC routinely resurface areas of flooring. All flooring jobs are carried out at the weekend so as not to interfere with normal production. The first job is the vacuum shot blast the floor surface to get down to non-oil-contaminated concrete. This has to be done as close to the existing machinery as possible as seen in the pictures. Where excess oil is present we use an oil tolerant primer so that the subsequent resin systems have excellent adhesion to the floor surface’