Case Study #30

B&M Bargains Case Study

What They Needed

A busy distribution centre for a massive, National retail chain required new walkways and inspection pit borders, to comply with health and safety regulations. Due to the nature of the work carried out on the premises, there could be no downtown for the busy staff.

 

What We Did

Our team spent a couple of weekends installing the new flooring, working around distribution centre staff, to create minimal disruption to the running of the business.
We began by grinding and blasting the floor to get a key, then installed a super-fast drying MMA resin, to ensure full access could resume as soon as possible.
This type of resin sets within just 30 minutes to enable this centre to maintain their 24/7 operations.

Client Feedback

Our client at B&M Bargains were very appreciative of the speed with which our guys were able to work, completing the essential project with minimal disturbance, and to a high-quality standard.