At Leoni Temco There was a bunded area that had deteriorated and was in need of refurbishment. The aggressive chemicals had stripped off the existing coatings and broken down the concrete beneath.

What we did

Maintenance Supplies Contracts were tasked with refurbishing the bunded area. First the surface was prepared with a diamond grinder and the flooring was reinstated with a 9mm resin Anti-Slip Screed system. Then the entire area was coated with a chemical resistant multi-coat resin system specified specifically to be resilient to the chemicals that are present within the bund. All the work was carried out over one weekend.

Client Feedback

The job was completed in time and within budget to a satisfactory standard.