Case Study #20

UBH Tanks Case Study

What they needed

The spray booth floors at UBH were in a terrible state of repair creating a trip hazard and rendering the floors unusable. The floors had broken up due to the massive weights on them. The trucks push the tanks in and out for paint spraying. These are the tanks you see on road chemical tankers. They weigh several tonnes.

What we did

Maintenance Supplies Contracts used various diamond grinding machines to prepare the floor surface and secure the substrate with a deep penetrating primer. We then pumped a high strength screed level over the whole area to make it perfectly flat. This was solid within 8 hours and back in use. The work was carried out over a weekend so as not to interfere with production.

Client Feedback

The job was completed in time and within budget to a satisfactory standard.