Case Studies...
|
Paccar Parts had a serious concrete dusting problem under the canopy with dust blowing into the b... |
An engineering company took over an old vegetable packaging company premises to manufacture found... |
|
The floor area inside the loading dock was hazardous due to water being brought into the building... |
This Vehicle Maintenance Unit floor had been installed badly and there were holes and lumps every... |
|
The spray booth floors at UBH were in a terrible state of repair creating a trip hazard and rende... |
At Loxtons foods an old and worn out food factory had to be refurbished in three weeks.... |
|
Two local businesses have joined forces to reach a 5 Star Quality Standard.... |
At Cambridge Commodities there was a requirement for a clean room environment in 150m2 in two pac... |
|
Severn Trent Water had a health and safety problem where loose concrete was dropping from the cei... |
Maintenance Supplies Ltd were asked to complete concrete repairs and install a n... |
|
At Leoni Temco There was a bunded area that had deteriorated and was in need of refurbishment.... |
At Trinity Mirror, Manchester, there was a problem with the fork lift trucks skidding on the conc... |
|
At Mark 11 Distribution there were severe problems within the aisles of the warehouse due to the ... |
The floor area inside the main entrance of Sandcastle Waterworld in Blackpool was a tiled surface... |
|
Maintenance Contracts Ltd were asked to install an anti-slip profile on the mova... |
Rochelle In Health needed a "Clean Room" environment, a highly durable dust free... |
|
Maintenance Contracts Ltd were asked to install new demarcation lines for pedest... |
Maintenance Supplies Contracts have completed another successful program of work at a fresh water... |
















